Working with RBS and CBS views

Quick links

Introduction to resource and cost breakdown structures (RBS and CBS views)

How do I display an RBS or CBS view?

How do I specify whether to display summary tasks to represent resources and cost centres in RBS and CBS views?

How do I display more than one allocation on the same line in an RBS or CBS view?

How do I display tasks to which no resource or cost centre has been assigned in an RBS or CBS view, then assign resources or cost centres to such tasks?

How do I include resources or cost centres with no assignments in an RBS or CBS view?

How do I change an existing allocation of one resource or cost centre for another in an RBS or CBS view?

Introduction to resources

An introduction to permanent and consumable resources, on which RBS views are based

Introduction to costs

An introduction to costs and cost centres, on which CBS views are based