Rescheduling projects

Quick links

Introduction to rescheduling

How do I reschedule a project, or part of a project?

How do I specify how tasks with no links are rescheduled?

How do I specify how tasks with only outgoing links are rescheduled?

How do I maintain link logic during a reschedule when progress has occurred out of sequence?

How do I specify whether float is truncated during a reschedule?

How do I redraw links around completed tasks during a reschedule when progress has occurred out of sequence?

How do I specify whether the progress line should be straightened during a reschedule?

How do I specify which types of links to ignore during a reschedule?

How do I calculate the drag of critical tasks?

How do I calculate the cascade activity number of tasks?

How do I check the integrity of the critical path?

How do I configure Asta Powerproject to reschedule automatically each time an edit is made?

How do I filter for tasks that have been marked as critical as a result of rescheduling?

How can I monitor the slippage of tasks?

How do I use logical paths to monitor the erosion of total float?

Understanding the results of rescheduling

Information on float, critical tasks and negative float, which may result after a reschedule

Factors that affect rescheduling

How different factors such as constraint flags, calendars, progress and links can affect where tasks are positioned

Reschedule errors

Information on the errors that can occur during rescheduling and how to deal with them

Producing reschedule reports

How to produce and view reports that detail the results of rescheduling and any errors and anomalies that come about as a result of it