Duration/link slope

The Duration/link slope control displays the current duration of the selected task, or the time period over which the selected link slopes. To change the duration of the selected task or the time period over which the selected link slopes, click the control and enter a new duration.

Related Topics:

Changing the duration of tasks

Link slope